Lumeng Construction Machinery

NEWS CENTERL

Before the water well drilling rig is officially started, the trial operation test should be carried out.


Release time:

2023-12-14

Check whether the fuel quantity of each fuel tank is sufficient and whether the oil quality is normal. Check whether the gear oil of each reducer is sufficient and whether the oil quality is normal; check for oil leakage;

First, check whether the amount of oil in each fuel tank is sufficient and whether the oil quality is normal. Check whether the gear oil of each reducer is sufficient and whether the oil quality is normal; check for oil leakage;
Second, check whether the main rope and auxiliary rope are broken and whether the connection is intact.
Third, check whether the elevator is flexible and whether the internal butter is contaminated.
Four. Check whether the reinforcement has strong cracks, rust, hydraulic drilling rig, welding and other damage.